The drainage trenches are fininshed, but we still have a lot to do

In the past weeks we’ve completed the drainage trenches and filled them with around 90 tonnes of gravel. As soon as things dry up, we’ll levelize the infield and continue with the next layers. A lot is also happening around the Entenhouse.

We’ll be forcing the work in the next weeks, so that we can repair and resow the grass in time.

Posted in Ballpark Construction